Pune Media

Delhi-Ghaziabad-Meerut RRTS: Namo Bharat all set to enter Delhi, PM Modi to ride newly opened stretch today – Infrastructure News

The highly anticipated Delhi section of the Namo Bharat Rapid Rail Transit System (RRTS) is set to be inaugurated on Sunday (January 5) with Prime Minister Narendra Modi attending the event in Ghaziabad, Uttar Pradesh. PM Modi will visit the Sahibabad RRTS station at 11 am and take a ride on the Namo Bharat train to New Ashok Nagar station.

The newly inaugurated 13-kilometer stretch will connect Sahibabad in Ghaziabad to New Ashok Nagar in Delhi via Anand Vihar. Once operational, the extended RRTS corridor will span 54 kilometers with 11 stations, significantly reducing travel time between Delhi and Meerut to just one hour.

The operational Rapid Rail Transit System (RRTS) currently runs between Sahibabad and Meerut. With the new extension, two stations in Delhi — New Ashok Nagar and Anand Vihar — will join the corridor. Further expansions are slated for April and May 2025, with the opening of Sarai Kale Khan and Jangpura stations.

Delhi-Ghaziabad-Meerut RRTS Corridor

Delhi-Ghaziabad-Meerut RRTS Corridor: Namo Bharat trains cross 5 million commuters since October 2023 launch, says NCRTC

South Western Railway

South Western Railway to run special trains between Bengaluru and Kochuveli

DMRC

Delhi Metro Update: DMRC’s 5-km metro corridor proposal to connect Noida, Delhi airports to be reviewed by UP CM Yogi Adityanath

PM Modi, MEA, Kuwait Visit, Gulf Cooperation Council, GCC, Arabian Gulf Cup

PM Modi to embark on historic 2-day visit to Kuwait tomorrow, first by Indian PM in 43 years

All about new RRTS stations

New Ashok Nagar station will feature seamless connectivity to the New Ashok Nagar Metro station via a 100-meter foot overbridge. Additional footbridges are being constructed to connect nearby areas such as Chilla Village and Mayur Vihar Extension, improving accessibility. Anand Vihar station, the first underground stop on the RRTS line, is set to become a key transit hub, connecting to the Pink and Blue Metro lines, Anand Vihar railway station, and inter-state bus terminals.

Designed to handle heavy foot traffic, Anand Vihar station will be equipped with three lifts, five escalators, and two entry/exit gates. Currently, the RRTS corridor features nine operational stations, including Sahibabad and Meerut South. With these new additions, the total number of stations will increase to 11, further bolstering connectivity across the region.

RRTS trial and current operations

The Namo Bharat RRTS trial runs on this stretch began in October 2024, and the necessary certifications from the Commissioner for Metro Rail Safety (CMRS) were recently acquired.

Currently, the Namo Bharat trains operate on a 42-kilometer stretch from Sahibabad to Meerut South, covering nine stations, including Ghaziabad, Guldhar, and Duhai. The extension to New Ashok Nagar marks a significant milestone in the development of the Delhi-Ghaziabad-Meerut RRTS corridor.



Images are for reference only.Images and contents gathered automatic from google or 3rd party sources.All rights on the images and contents are with their legal original owners.

Aggregated From –

Comments are closed.

This website uses cookies to improve your experience. We'll assume you're ok with this, but you can opt-out if you wish. Accept Read More