Advertise with Pune MediaAdvertise with Pune MediaAdvertise with Pune MediaAdvertise with Pune Media

Top 5 This Week

Advertise with Pune MediaAdvertise with Pune MediaAdvertise with Pune MediaAdvertise with Pune Media

Related Posts

Invalid signatures halt Swiss vote to ease solar power plant rules

Editorial Disclosure: This article is curated from reporting by the original publisher credited below. It was selected and published automatically under the Pune.Media Editorial Policy and is not original Pune.Media reporting.

Original Coverage & Source Attribution: www.swissinfo.ch

Initiative for solar installations without planning permission has failed

Keystone-SDA

A Swiss popular initiative aimed at loosening planning rules on solar power plants has failed due to a high number of invalid signatures. The 18-month deadline for collecting 100,000 valid signatures has now passed.

Listen to the article

Listening the article

Toggle language selector

  • English (US)

  • English (British)

Generated with artificial intelligence.

This content was published on

The construction of solar power installations in Switzerland is often blocked by heritage conservation bodies or townscape committees.

+ Alpine nimbyism freezes Swiss green energy dreams

The federal popular initiative “For solar installations exempt from planning permission” had not been submitted with the required number of signatures by October 8, 2026, the Federal Chancellery announced on Friday in the Federal Gazette. The deadline for collecting signatures had therefore expired.

More

More

Energy transition

Swiss Alpine solar farms struggle to deliver on their promise

This content was published on

Switzerland fast-tracked Alpine solar parks to boost winter power. Four years on, only a handful are being built and electricity targets are slipping.

Read more: Swiss Alpine solar farms struggle to deliver on their promise

The initiative committee did not include any nationally recognised figures. The Federal Gazette lists seven private individuals from an interest group. The committee is based in Basel-Country.

The association’s website states that 117,500 people are said to have signed the petition. During the verification process in July and August, it emerged that almost 20,000 signatures were invalid, said Roland Weiss, one of the initiators of the initiative, in response to an enquiry from the Keystone-SDA news agency.

More

Solar panels on the Muttsee dam in the Glarus Alps, August 2021.

More

Climate solutions

Five unusual places to install solar panels in Switzerland

This content was published on

Solar energy is essential for achieving a zero-emission society. But where to produce it in large quantities? Here are the most curious and promising Swiss ideas.

Read more: Five unusual places to install solar panels in Switzerland

“Our lawyer is currently investigating the circumstances.” It is currently being clarified how such a high number of invalid signatures could have arisen despite the involvement of signature-collection firms.

The initiative, which has now failed, called for a new constitutional article to be enshrined for solar installations on buildings and structures.

For such installations, no planning permission would have been required either within or outside protected townscapes and landscapes.

Exceptions would have been possible for installations on cultural monuments of national or cantonal significance, as well as on historic sites. In such cases, a planning permission could have been granted subject to certain conditions.

More

New solar research facility is being built on farmland in Suhr, Aargau

More

Climate solutions

New Swiss solar research facility aims to boost agriculture

This content was published on

Agri-PV research facility to boost agriculture with solar power.

Read more: New Swiss solar research facility aims to boost agriculture

+ How we produce news in English
Translated from German, reviewed by an English Department journalist. 

Articles in this story

Popular Articles